REXROTH DKC10.3-012-3-MGP-01VRS CONTROLLER
Company Information:
Name: |
REXROTH DKC10.3-012-3-MGP-01VRS CONTROLLER |
Category: |
|
Offered by: |
|
REXROTH DKC10.3-012-3-MGP-01VRS CONTROLLER Description:
Sales Manager: Nancy Lin
Email: info@amikon.cn
Skype: onlywnn_1
Mobile(Whatsapp): (+86)-18020776786
Amikon :
Shipping Term : TNT,DHL,FEDEX,ETC
Payment Term : T/T
Warranty: 12 month
Amikon supply: New+original+factory sealed+high quality
Service: quotation will be sent in 9 hours
Skype + whatsapp + mobile = 24 hours /day Oneline.
1.Q:What about your shipping terms ?
A: We can ship by DHL,UPS,FEDEX,ARAMAX,TNT,and so on
2.We're in this field more than 12 years. If there's any problem, please contact with us,we'll provide suggestion from our engineer to help you solve problem.
3.Q:How long warranty does Amikon can provide ?
A: Amikon can provide 1 year warranty !
Our services
Packing & Delivery
1)100% full New! - Original Factory Seal !
2)Warranty: 12 months!
3)Package: Original packing with cartons.
4)Delivery time: Shipped in 3 days after payment
Best Quality Assurance:
1. We only provide the original new items, 100% make sure the best quality!
2.1 year warranty GUARANTEE OF QUALITY (After Our Delivery Date).
REXROTH DKC10.3-012-3-MGP-01VRS CONTROLLER
REXROTH DKC10.3-012-3-MGP-01VRS CONTROLLER
REXROTH DKC10.3-012-3-MGP-01VRS CONTROLLER
Once the gas turbine is installed, a performance
test is usually conducted to determine
power plant performance. Power, fuel, heat
consumption and sufficient supporting data
should be recorded to enable as-tested performance
to be corrected to the condition of
the guarantee. Preferably, this test should be
done as soon as practical, with the unit in new
and clean condition. In general, a machine is
considered to be in new and clean condition if
it has less than 200 fired hours of operation.
Testing procedures and calculation methods are
patterned after those described in the ASME
Performance Test Code PTC-22-1997, “Gas
Turbine Power Plants.” Prior to testing, all station
instruments used for primary data collection
must be inspected and calibrated. The test
should consist of sufficient test points to ensure
validity of the test set-up. Each test point should
consist of a minimum of four complete sets of
readings taken over a 30-minute time period
when operating at base load. Per ASME PTC-22-
1997, the methodology of correcting test results
to guarantee conditions and measurement
uncertainties (approximately 1% on output and
heat rate when testing on gas fuel) shall be
agreed upon by the parties prior to the test.
PHD DHVB 3/4 X 1 0154695-01
PHILIPS BUZ58 BUZ58A 1KV 3.6A TO 238AA
Dodge Flange Bearing, 128785 F4BDL108, 782475891894
SMC AFM3000-03C
Agastat Timer 7022AB .5-5 SEC. 120V Coil 7022-AB
FESTO DNN-63-100-PPV-A
Box of 25 Parker Truplelok-S Union Tee Fitting 6JTX-S
FERRAZ SHAWMUT A70P50-4
AIRMASTER / EMERSON 642-AC K55HXMAL-4064 21017 1/3HP 115V 2.7A 3 SPEED
Box of 25 Parker 12-6TRTX-S
LEHIGH RPK-200-1 K201
Hydraulic Cylinder APPROX: 30-3/4" 11-3/4" STROKE, 5/8" SHAFT 12"
DODGE TB-DL-100 1" 2 BOLT
Moore MVX Millivolt Tran MVX/0-179V/4-20MA/12-42dc-atfl
Moore DCX Digital Indicator MVX/0-138.8V/4-20MA/12-42DC
Siemens Sitrans P Transmitter 7mf4020-1ga00-1bd1-z
FERRAZ SHAWMUT A50P40-4 40A 500VAC
GE FANUC IC693CPU331Y CPU MODULE, CPU 331
DODGE TB-DL-012 3/4" 2 BOLT
BANNER MSE4824 0.75" 19mm BLACK
Industrial VINTAGE PORTHOLE 6" window
GE IC3600SSFG1B1A General Electric IC3600
RELIANCE MD-B3006C RM1-001
MITSUBISHI CM200DY-24A 204G S5DEA1
HONEYWELL AV931AB142 120V 50/60Hz 0-250F
GE GENERAL ELECTRIC INNOVATION SERIES NAVIGATION CR104PXG40
DODGE F2B-DL-104 DL 1-1/4 2 BOLT
BIMBA F0-313.5 FO-313.5 FLAT-1
WARREN RUPP INC. 286-093-600
Moore Frequency DC Transmitter EPFDX/Q/4-20ma/12-42dc
METAL WORK 2300250025XP 025 BORE 0025
BIMBA TB-2516-EF TB2516EF 10 BAR
Eaton MTE CORP. TRANSFORMER 64-865-10
REXROTH DKC10.3-012-3-MGP-01VRS CONTROLLER was added in Jun 2018
REXROTH DKC10.3-012-3-MGP-01VRS CONTROLLER has been viewed 483 times
20 More Products from Amikon Automation Equipment Co., LTD :