SMT, PCB Electronics Industry News

OCTG Casing Running Procedures

Nov 29, 2023

The OCTG (Oil Country Tubular Goods) casing running procedures typically involve the following steps:

1. Preparing the rig and equipment: Ensure that the drilling rig is set up properly and all required equipment is in good working condition. This includes checking the elevators, slips, tongs, and other tools needed for handling the casing.

2. Inspecting the casing: Before running the casing, inspect each joint of the casing string to check for any defects, such as cracks, dents, or damaged threads. Any defective casing should be set aside and replaced.

3. Preparing the wellbore: Clean the wellbore and ensure it is free from debris and obstructions. Perform a wiper trip or use scrapers and brushes as necessary to ensure a clean wellbore.

4. Adding casing centralizers: Install casing centralizers at appropriate intervals along the casing string. Centralizers help maintain proper standoff between the casing and the wellbore, ensuring uniform cementing and reducing the risk of casing damage or differential sticking.

5. Running the casing string: Use the rig's casing running equipment to carefully lower the casing into the wellbore. Maintain steady tension and alignment throughout the operation. Use power tongs or manual tongs to make up each casing joint, ensuring proper torque and thread engagement.

6. Cementing the casing: Once the casing string is properly positioned in the wellbore, cement is pumped down the casing to fill the annular space between the casing and the wellbore. Follow standard cementing procedures to achieve proper zonal isolation and bonding between the casing and the formation.

7. Pressure testing and setting packers: After the cementing is complete, pressure test the casing to check for leaks or integrity issues. Install any required packers or other wellbore equipment as needed for the specific well design and requirements.

8. Finalizing the casing installation: Once the pressure testing and additional installations are complete, verify that the casing string is correctly installed and secured. Ensure that appropriate running procedures, torque, and thread compounds have been applied and that all connections are properly made up.

It is important to note that these procedures can vary depending on the specific well conditions, drilling rig equipment, and industry standards. The procedures should always be conducted in accordance with the relevant company policies, regulations, and best practices.

For more informations visit:www.threewaysteel.com/www.threeway-steel.com

Nov 29, 2023 -

Seamless Steel Pipes Possess Several Industrial Attributes

Nov 29, 2023 -

The Difference between Hot-dip Plastic Steel Pipe And Plastic-coated Steel Pipe

Nov 29, 2023 -

Precautions for Welding Stainless Steel Pipe

Nov 29, 2023 -

Causes of Cracking of Stainless Steel Welded Tube

Nov 29, 2023 -

Cutting of Large Diameter Seamless Steel Pipe

Nov 22, 2023 -

All About Stainless Hollow Section

Nov 22, 2023 -

Why We Use Seamless Steel Pipe

Nov 22, 2023 -

Seamless Steel Pipes Possess Several Industrial Attributes

Nov 22, 2023 -

The Industrial Characteristics of Carbon Steel Pipes

Nov 22, 2023 -

A106 Vs. A53 -- Welded Vs. Seamless Steel Pipe

2 more news from Threewaysteel »

Jun 11, 2024 -

Shaping the Future: Prototyping Solutions for Industry Pioneers

Jun 10, 2024 -

KYZEN to Focus on AQUANOX A4618 and ANALYST2 at SMTA Oregon

Jun 10, 2024 -

Heraeus Successfully Defends Patent for Metal Sintering

Jun 10, 2024 -

SHENMAO Develops Thermal Fatigue-Resistant Solder Paste PF918-P250 for High-Reliability Requirements

Jun 10, 2024 -

KYZEN to Highlight 3D Printing Process Resin Cleaners at RAPID + TCT

Jun 10, 2024 -

StenTech BluPrint™ PVD Surface Treatment showcased at SMTA Querétaro Expo & Tech Forum

Jun 10, 2024 -

MicroCare Introduces Cutting-Edge Tergo™ Cleaning Fluids to Precision Cleaning Fluid Line

Jun 10, 2024 -

Odyssey Electronics Enhances PCB Assembly Quality with Acquisition of MIRTEC MV-6 AOI Machine from The Murray Percival Company

Jun 10, 2024 -

Essemtec is exhibiting at SMTconnect booth 4.209.

Jun 10, 2024 -

James Will to Lead USPAE as New Executive Director

See electronics manufacturing industry news »

OCTG Casing Running Procedures news release has been viewed 103 times

Equipment Auction Automotive Electronics Supplier - Closure of Tier-One SMT Dvision: (10) ASM & Universal SMT Lines & Feeders Equipment as-new-as 2019! Dek | Koh Young | Speedline | Vitronics | Viscom