NPI back on Schedule after ECO

Jan 21, 2008

Added Trace under BGA

Added Trace under BGA

Missing NPI schedules frustrates the OEM and EMS provider. Engineering Changes (ECOs) on the PCB can delay NPI by weeks. Additive Circuits, Inc. has used it's technology to accomplish added traces and SMT pads and reduce existing pad dimensions. By modifying the PCB prior to assembly changes such as BGA pad connections can be done with little or no impact on assembly or schedules. Vist us at http://www.additive.com

You must be a registered user to talk back to us.

More News from Additive Circuits, Inc.

Jan 21, 2008 -

NPI back on Schedule after ECO

Dec 06, 2007 -

Additive Circuits, Inc. Makes BGA Modification Break-through, Adds New Conductors

Oct 24, 2007 -

Eliminate Hand Rework

NPI back on Schedule after ECO news release has been viewed 584 times

Manufacturing Software

Polymeric Workmanship PCB for Training