Taking the LED Pick and Place Challenge

Published:

September 25, 2014

Author:

Joshua J. Markle.

Abstract:

For the past few years there has been a shift in the Lighting Industry that has carried over to the surface mount technology assembly line. What is this shift you may ask? Well it is the LED revolution. This revolution or change in lighting has some very promising results already in practice and many more companies looking to implement the LED technology into their product portfolio's. With a number of companies looking to expand their portfolio to include LED fixtures there has been an increase in the number of companies that have started their own SMT lines, as well as a significant number of contract manufacturers to meet this new industries demands (...)

This presentation will discuss some issues in the pick and place process for LEDs and presents a method to troubleshoot and resolve these issues....

  • Download Taking the LED Pick and Place Challenge article
  • To read this article you need to have Adobe PDF installed

October 14, 2014

If I can add a suggestion. Increasing the machines "blow off" helps with the release of component and disabling any type of auto pickup location teach. Great article.

March 2, 2017

I have cooled the LED's before placing, like in a refrigerator. I also have the polyurethane tips on my nozzles. Would suggest getting the "castellated" tip though.

You must be a registered user to talk back to us.

 
Company Information:

Cree, Inc.

Cree is a market leader in LED chips, power LEDs, LED backlighting, power switching and wireless communications devices.

Durham, North Carolina, USA

Manufacturer's Rep

  • Phone 919.313.5300
  • Fax 919.313.5453

Cree, Inc. website

Company Postings:

(2) technical library articles

(1) news release

  • Dec 07, 2017 - Utility of Dual Applicators for Non-Atomized Conformal Coating to Improve High-Volume Manufacturing Optimization | Nordson ASYMTEK
  • Jul 27, 2017 - Electrochemical Methods to Measure the Corrosion Potential of Flux Residues | KYZEN Corporation
  • Jul 21, 2017 - How to calibrate JUKI CF feeder | ZK Electronic Technology Co., Limited
  • Jun 01, 2017 - Evaluating the Effects of Plasma Treatment prior to Conformal Coating on Electronic Assemblies to Enhance Conformity of Coverage | Nordson MARCH
  • Mar 30, 2017 - Solder Paste for BGA Rework | Multiple Methods for Applying Paste Flux | BEST Inc.
  • Browse Technical Library »

Taking the LED Pick and Place Challenge article has been viewed 1756 times

SMT Equipment