Printed Circuit Board Assembly & PCB Design SMT Electronics Assembly Manufacturing Forum

Printed Circuit Board Assembly & PCB Design Forum

SMT electronics assembly manufacturing forum.


Dek 248 Install Time

Views: 2711


aex

#66884

Dek 248 Install Time | 26 July, 2012

Weird question, but I need it for a claim. About how long does it take to assemble, plug in the power and dry cycle a DEK 248 with vision. I'm saying 90 minutes to two hours tops. Additional opinions would be greatly appreciated.

reply »

#66998

Dek 248 Install Time | 9 August, 2012

Depends on to what degree it has been disassembled; How much verification of repeatability is required; and if everything actually works... 2 hour - 2 days.

reply »

Plasma Prior to Conformal Coating

Heller Industries Mark 5获得了 2015年中国SMT远见奖 - 回焊炉领域