Printed Circuit Board Assembly & PCB Design SMT Electronics Assembly Manufacturing Forum

Printed Circuit Board Assembly & PCB Design Forum

SMT electronics assembly manufacturing forum.


Re: Hewlett Packard 5DX X-ray system

Steve Abrahamson

#15880

Hewlett Packard 5DX X-ray system | 15 May, 1998

We are looking to bring in a HP 5DX System. This is the laminography equipment formerly known as Four Pi. I have our sales rep getting us a few references, but I wanted to get some opinions from the tech net. I am looking for input from someone whom has worked with a modern model (last 2 years), and most contacts have horror stories of the Four Pi equipment from the early 1990s. From the info available, I am working under these assumptions for the 5300 series machine: For complex assembly with double sided actives and 20K solder joints a program run time of 5-7 minutes for effective coverage. 10 day programming time for first 2 months, moving down to 6 days after 6 months, and 4 days after a year. 100% of Process Engineer and 100% of Programmer for 6 months, and then 50% Process Engineer and 100% of Programmer continuing. Obviously these variables are dependant on the number of products, and depends on how thorough we plan to be, but I wanted to know if my assumptions are way off! Steve Abrahamson

reply »

Brian L. Pollitt

#15881

Re: Hewlett Packard 5DX X-ray system | 21 May, 1998

| We are looking to bring in a HP 5DX System. This is | the laminography equipment formerly known as Four Pi. | I have our sales rep getting us a few references, but I | wanted to get some opinions from the tech net. | I am looking for input from someone whom has worked with | a modern model (last 2 years), and most contacts have horror | stories of the Four Pi equipment from the early 1990s. | From the info available, I am working under these assumptions | for the 5300 series machine: | For complex assembly with double sided actives and 20K solder joints | a program run time of 5-7 minutes for effective coverage. | 10 day programming time for first 2 months, moving down to 6 days after | 6 months, and 4 days after a year. | 100% of Process Engineer and 100% of Programmer for 6 months, and | then 50% Process Engineer and 100% of Programmer continuing. | Obviously these variables are dependant on the number of products, | and depends on how thorough we plan to be, but I wanted to know if | my assumptions are way off! | Steve Abrahamson | Steve - sounds like you've got some humungous boards to test!! To sanity check, We (GPT in the UK) have been using 5DX for 2 years typical board sizes 2500-8000 joints. run times 90 secs to 4 mins for biggest. But this is Series 1 - expect SII 40% faster. We're about to upgrade - I'll tell end July! Programming time - 1.5 days for small board Your boards I would expect 3-4 days max, depending on complexity. But don't try to be too clever - stick to gross defects only - shorts, opens, missing, misplaced misaligned. Time consuming activity is bringing false call rate down - a good target is 500 dpmo for mature process. / program. It's easier to train a process engineer than a board test guy. If you want to discuss further drop me a line. Brian Pollitt Process Eng. Mgr. GPT.

reply »

pressure curing ovens

Equipment Auction - Eagle Comtronics: Low-Use Electronic Assembly & Machining Facility 2019 Europlacer iineo + Placement Machine  Test & Inspection: Agilent | Tektronix | Mantis Machine Shop: Haas VF3 | Haas SL-20 | Mult. Lathes