Printed Circuit Board Assembly & PCB Design SMT Electronics Assembly Manufacturing Forum

Printed Circuit Board Assembly & PCB Design Forum

SMT electronics assembly manufacturing forum.


PICK & PLACE - REEL COMPONENT WASTE QTY CAN BE MAP IN ERP

Views: 1964

#56571

PICK & PLACE - REEL COMPONENT WASTE QTY CAN BE MAP IN ERP | 18 September, 2008

HAI, WE HAVE SOME MIN QTY (4-6) OF WASTAGES DURING LOADING & UNLOADING OF REEL COMPONENTS, THIS WASTED QTY CAN BE MAPPED ( COVERED ) IN THE ERP-ORACLE 11i -SYSTEM.

I WISH TO KNOW WETHER THIS COMPONENTS CANBE COME IN ACCOUNT WITH THE ERP SYSTEM.

CAN ANY BODY HELP US.

THANKS.

reply »

#56588

PICK & PLACE - REEL COMPONENT WASTE QTY CAN BE MAP IN ERP | 18 September, 2008

Every MRP is peculiar, but sure you should be able to account for componant loss when setting-up a feeder. Most MRP systems can account for this as spoilage or setup. On the other hand, who cares? We sweep-up a handful of fly shit every time we clean a machine.

reply »

See Your 2024 IPC Certification Training Schedule for Eptac

Manufacturing Software